mega project of nepal

KATHMANDU: Deputy Prime Minister and Energy Minister Baburam Bhattarai on 10 thousand eight hundred MW Karnali Chisapani project is beneficial for South Asia in collaboration with the government of China and India said they had proposed to make.

He flood control, energy production, tourism, and other benefits on the basis of the dry-controlled water to the two neighboring countries share the investment proposal described in the decision.


The budget 'Karnali Chisapani Multipurpose Project in India, China and Nepal to initiate the development project of the tripartite alliance "is mentioned.

Lalitpur on Monday, the Ministry of Energy held a press conference at the great, great cost and great benefit as the South Asia region that he would like to share. "It is a proposal, not a solid decision came out," he said.

License to American multinational company Enron Chisapani hand (after the collapse of) the best of the year was 2054.

Basically downstream benefits without protracted licensing issues mean that the government's strong opposition, saying then after this episode was diminished.

Nepal and India together make this project was sent to the Nepalese students to read Roorkee, India. For the first time in Roorkee 1 9 80 50 engineers came through.

Nepali inundated gather pieces of winter monsoon flood control and water price control price the day before the project could not rise as India nacahepachi former Minister for Water Resources and resource lamp committe.

"The price of these benefits aside, it does not mean promote the project," Kamal said on Monday Annapurna postasamga, drought-controlled water for irrigation is amrtasaraha, put petrol in India is not irrigation. "

Meanwhile, Energy Minister Khanal said its profit and cost base chimekiharusita we discuss it moved forward.

Deputy Prime Minister Rayamajhi next year bajetamai energy crisis stemming from the decade troubleshooting and Power Development Act as it would be applied with confidence.

The government last March 7 alleviation action plan on energy crisis had passed. RBF bajetamai stemming from the Action Plan implementation not be blamed for fear urged Rayamajhi.

The action plan will end in the next year and the next year a significant load shedding as the end of the three years of self-reliance is mentioned.

Prime Minister, Minister, Secretary and Chief District Officer, coordinator of the various committees who are embarrassed, and disruption of the action plan for the development of the energy sector as the end of the document has been excellent so far, also the energy minister claimed.

He also completed 10 years without the responsibility of the Ministry of Khimti Dhalkebar 220 kV transmission line, the fulfillment of the Nepal-India Transmission Line said.
SHARE

About Nepali Online Post

    Blogger Comment
    Facebook Comment

0 comments:

Post a Comment